Wednesday, September 26, 2012

Summer Projects

When we moved to this house, we decided the den needed a bar.  Three years and one toddler later the design was finalized and the bar was built and finished this summer.

The Tooth based the design on the elements that worked from the hacked together version we had once the kegerator arrived.  I think he did a great job.  We had a ton of help from my parents (thanks again by the way!)  He and my Dad built, I did the finish work with a bit of help.  It took three weeks thanks to the humidity from hell, but it got done.  Overall, I think it turned out rather well.  Still waiting to hear back about the fabric for the curtains we want.  The kitchy beer mugs are only temporary.

So, without further rambling, here it is!